Skip to content

Field guide · Pushback · 7 minutes

How to prove you can deliver: proof, references, pilots

Most buyers have been let down before by a tool that did not keep its promises. Name the exact doubt, answer it with the proof that matches it, ideally the voice of a comparable customer, and keep the pilot for the doubt nothing else can lift.

Name the doubt precisely

  • “Can you deliver?” covers four different doubts, and each needs a different proof:
  • The product: does it do what you say, on a case like ours?
  • The implementation: can it be connected and set up in our environment, in the time we have?
  • Adoption: will our people actually use it?
  • The vendor: will you still be here, and will you support us?
  • Ask before you answer: “What experience is behind this concern? Who would do the work on your side? What would a smooth rollout look like for you?”
  • Check whether it is really a doubt about you, or a question of timing or internal capacity in disguise.
  • The decision-maker is asking: how much, when, and how certain. Inflated return figures make the third answer worse, not better.

Match the proof to the doubt

  • Stories, not logos. The problem, how big it was, what it cost, what was done, why it worked better than the alternatives, the result. A customer story must be one a real participant would confirm.
  • Relevant ones. Same problem, same industry if possible. The same result told by three customers weighs more than any claim of yours.
  • By stage. Early on, stories that mirror their problem. During evaluation, what sets you apart. Near the decision, what lowers the risk: reliability, a successful rollout, measured results.
  • No demo without discovery. A demo before you understand the problem is a dart thrown in the dark. If you must, spend the first minutes on the problem and what success looks like. Prepare the demo with your champion, who can ask a precise question during it.
  • On their case. Show it working on their data or their situation, not on a generic one.
  • If the proof does not exist yet, say so. Being honest about being early is more credible than a borrowed story. Know two or three of your colleagues' customer stories well enough to tell them.

Let a customer speak

  • Match the reference to the role of the person who doubts: someone who made the decision, someone who led the rollout, or someone who uses the tool every day. A doubt about delivery calls mostly for the last two.
  • Prefer a recent buyer: why they chose, and against what, is still fresh.
  • Speed is part of the proof. A reference arranged in two days says something; one that takes two weeks says something else.
  • Brief the reference beforehand on who they will talk to and what worries them. Then step back: “Don't take my word for it, hear it from someone we worked with.”

Build the proof as you go

The best proof for your next customer comes from this one. Agree early how success will be measured, and what you may share once it is reached: a quote, a reference call, a short story. Today's measures are tomorrow's proof.

For each story you tell, know what lies behind the figure: the problem the customer faced, why they chose you, what was at stake if it failed, and how they measured the result. A number without its story persuades nobody; the story is what the buyer repeats internally.

Keep the pilot for what nothing else lifts

  • Conditions first. A champion, a decision-maker you have met, success criteria you can meet, and a commitment to buy if they are met. Never a pilot without concrete measures.
  • Frame it. An executive sponsor, milestones, what happens if a milestone slips, who does what, and what you get in return (for example, a public reference).
  • Pick the right size. A two or three day trial in a test environment is often enough. A paid pilot of one or two months is for when an integration is needed, with criteria and tasks written together.
  • One use case. The most painful one, which proves the return fastest.
  • Or no pilot at all. A smaller start with an exit option at an agreed date lowers the risk without the delay. Agree early measures that show the project is on track.